A parking building with a capacity of 1,541 units of four-wheeled vehicles was built by Governor Koster in Besakih

  • 13 Maret 2023
  • 11:03 WITA
  • News
A parking building with a capacity of 1,541 units of four-wheeled vehicles was built by Governor Koster in Besakih

KARANGASEM, Balitopnews.com - Leadership of the Governor of Bali, Wayan Koster and Deputy Governor of Bali, Tjokorda Oka Artha Ardana Sukawati in implementing the P&rogram The protection of the Sacred Area of ​​Pura Agung Besakih in accordance with the vision of Nangun Sat Kerthi Loka Bali through the Planned Universal Development Pattern towards a New Era of Bali deserves a thumbs up. Murdaning Jagat Bali from Sembiran Village, Buleleng has successfully held the Pelaspas Ceremony for the Sacred Area Facility Pura Agung Besakih in the womb of Purnama Kasanga, Monday (Soma Umanis, Medangkungan) 6 March 2023 as a marker of the end the process of building facilities for the Besakih Sacred Area, and ready to be utilized in serving the Balinese or Hindus tank ngaturang bhakti at the biggest temple in Indonesia, even in this world. In the speech of the Governor of Bali, Wayan Koster regarding the New Order of Entering the Sacred Area of ​​Pura Agung, one of the facilities realized by the Chairman of the DPD PDI Perjuangan Province of Bali Province is the Manik Mas Area Parking Building (Kreta Graha Kulon) in Besakih

The Provincial Government of Bali built the Manik Mas Area Parking Building with adequate and quality space, namely: 1) Consists of 4 floors: Ground Floor (Top Floor), B1 (Lower 1st Floor), B2 (Top Floor Bottom 2), and B3 (Bottom Floor 3); 2) Special Parking for Four Wheeled Vehicles with a total capacity of 1,541 units, Ground Floor (94 units), B1 Floor (376 units), B2 Floor (449 units), Most Floor Lower B3 (507 units) 3) Filling parking is done sequentially starting from the lowest floor B3, floor B2, floor B1, and ground floor, floor moves are made after the floors below are filled ; 4) All floors are equipped with a digital monitoring system with light indicators on each slot, the green color indicates the slot is still available and the red color indicates the slot has been filled; 5) Each parking floor consists of several blocks equipped with a block code on the pillars; 6) Electronic Parking Ticket Facilities are available to enter and exit the Parking Building; 7) There are toilet facilities on every floor, including special toilets for the disabled, which are separate for men and women girls, free; 8) Stairs and elevators are available as connecting each floor; 9) There is a Parking Officer who regulates to enter and exit the vehicle; 10) The roof of the parking building is wearing Solar Power Panel (PLTS), with a capacity of 400 Kwh.

 "Four-wheeled vehicles are only allowed to park in the Manik Mas Area Parking Building (Kreta Graha Kulon), it is strictly forbidden to park on the road and in other places that are not parking lots," said the minister. The Governor of Bali, Wayan Koster, in his speech, appreciated all stakeholders who were present at the Pelalaspas Ceremony for the Sacred Area Facilities of Pura Agung Besakih. (Rls/Btnc)


TAGS :

Komentar